Rough Construction Price And The Art Of Time Management

Rough Construction Price And The Art Of Time Management

80.00 $
Language Classes
1 mes
Italy
Piedmont
37547 - Leipziger Stra?E 23
9 vistas
ID: 260210
Publicado Hace 1 meses por WaylonTrue4
80.00 $
En Language Classes categoría
Leipziger Stra?E 23, 37547 Chilometro 54, Piedmont, Italy
Obtener las direcciones →
9 vistas de elementos
Reporting on this current political local weather is a responsibility we don't take evenly, and we thank you in your help. Passive constructions require 10 per cent of the power employed by a standard dwelling constructed to current code requirements. Because of this, the undertaking achieved 41% water savings, 24% vitality financial savings, xây nhà trọn gói An Nhơn and a 12% increase in fresh air. Leer más

Publicado el 2025/04/23

Descripción

Reporting on this current political local weather is a responsibility we don't take evenly, and we thank you in your help. Passive constructions require 10 per cent of the power employed by a standard dwelling constructed to current code requirements. Because of this, the undertaking achieved 41% water savings, 24% vitality financial savings, xây nhà trọn gói An Nhơn and a 12% increase in fresh air.

Conoce al vendedor

WaylonTrue4
Amsinckstrasse 70, 90603, Ruckersdorf, Pellio Intelvi, Campania, Germany
18 anuncio activos
Vendedor personal
Último Hace 1 meses en línea
Registrado para 1 mes

Comentarios (0)

Aún no se han añadido comentarios
Agregar comentario
Enviar mensaje
¿Eres un vendedor profesional? Crea una cuenta